Solar generation, storage & grid connection

From land to interconnection, Yala Energy Limited delivers the full scope of a bankable, medium-scale solar IPP project.

What We Deliver

Three pillars of a dispatchable solar plant

The Muchenje Solar PV Plant combines high-efficiency generation with firm, dispatchable capacity — a replicable model for medium-scale IPPs across Sub-Saharan Africa.

Solar photovoltaic panel array
01

Solar PV Generation

High-efficiency monocrystalline PV modules, mounted on fixed-tilt or single-axis tracking systems, supported by central or string inverters and step-up transformers.

Aerial view of solar farm rows
02

Battery Energy Storage

Integrated lithium-ion BESS of 40–60MWh mitigates the intermittency of solar generation and provides firm capacity that stabilises the grid.

Electrical substation and power lines
03

Grid Interconnection

An 8.2km overhead line evacuates power to a new ZESCO 33/11kV substation, enabling efficient integration into the national grid.

Flagship Project

Muchenje Solar PV Plant

A 20MWp grid-connected facility located in the Chieftainess Mungule area, Chibombo District, Central Province, on a 41-hectare parcel held under a 99-year leasehold title owned by the sponsors. The flat topography minimises civil works costs and eases construction of the 33kV evacuation line, while the region's solar yield of approximately 5.5–6.0 kWh/m²/day ensures strong generation potential.

20MWpInstalled capacity
41haLeasehold land, 99-year title
8.2kmOverhead line to substation
USD 31MEstimated capex incl. 33kV line
How We Work

From site to power purchase agreement

01

Secure land & grid access

41 hectares held under a 99-year leasehold title, strategically located near a new ZESCO 33/11kV substation for efficient grid integration.

02

Design & engineering

High-efficiency monocrystalline modules on fixed-tilt or single-axis tracking systems, sized to the site's solar yield of 5.5–6.0 kWh/m²/day.

03

Storage integration

A 40–60MWh lithium-ion BESS is integrated to firm up output and support grid stability, enabling dispatchable renewable power.

04

Construction & grid connection

An 8.2km overhead 33kV line evacuates power to the national grid, benchmarked against similar IPP projects in the region.

05

25-year operation

Consistent renewable output over a 25-year design life, reducing Zambia's carbon footprint and enhancing grid stability.

Strategic Rationale

Aligned with national policy and global goals

Zambia's electricity sector relies on hydropower for roughly 85% of generation, leaving the country exposed to drought-driven load shedding. Government reforms now open the sector to Independent Power Producers, and the Muchenje Solar PV Plant is positioned to take advantage.

SDG 7

Affordable & Clean Energy

Diversifying the national mix away from drought-vulnerable hydropower.

SDG 13

Climate Action

Reducing greenhouse gas emissions through utility-scale solar generation.

SDG 8

Decent Work & Growth

Local employment and skills transfer during construction and operation.

NEP 2019

National Energy Policy

Directly aligned with the 8th National Development Plan's private-investment goals.

Interested in this project?

We're seeking an equity partner to strengthen our capital base and accelerate delivery of the Muchenje Solar PV Plant.